
Our principal items are Needle Roller bearings, Cylindrical Roller Bearings, Rod stop Bearings, Spherical simple bearings, Track roller Bearings for Guideway, Roller Bearings, Mix Bearings for forklifts, Water Pump Bearings, SNR Vehicle Bearings and all sorts of Spherical Bearings. We examine each piece of bearing by ourselves prior to delivery. We are aiming to satisfy the calls for of the consumers around the entire world.. SHEHWA HBXG DOZER
one: Mould: TY165-two SD6G SD7 SD8 SD9
2: close to identical house as EPT
three in excess of sea coaching
four: 1 yr warranty
five: with CUMMINS Motor
six: EPT requested for orEPTcan design
SD7 bulldozer are 230 horseEPT keep track of-kind dozer with elevated sprocket, EPT direct EPT, semi-rigid suspended and EPT controls. It can be equipped with straight tilting blade, angle blade, coal pushing blade, one shank ripper, a few shanks ripper. The taxi is Rops with air conditioner.
SD7-230 horseEPT, elevated sprocket bulldozer integrate modern secience into it, its new structure, very good overall performance, large doing work performance, safety and comfortable procedure problem, realiable entire top quality, outstanding provider is your sensible picking.
Principal specs
Functioning excess weight(not incXiHu (West Lake) Dis.Hu (West Lake) Dis. ripper)——————————————————————————–23800kg
Ripper excess weight—————————————————————————————————————3900
Floor pressure(without having ripper)—————————————————————————————-71.9kPa
Keep track of cEPTr length —————————————————————————————————-1980mm
Gradeability ———————————————————————————Latitude30 deg Transverse 25 deg
Floor clearance ———————————————————————————————————-404mm
Overall proportions(L times W times H) : ————————————-5677 times 3500 times 3402(with straight tilting blade)
EPT motor requirements
Design ———————————————————————————————NT855-C280 (EPT)
Rated pace————————————————————————————————————2100 RPM
Flywheel EPT(velocity at 2100 rpm) —————————————————————————169 kw(230hp)
Min. Gas Consumption ————————————————————————————— le235(g/Kw.h)
Principle journey pace (km/h)
1st EPT EPT -three.9 1st EPT backward -four.8
2nd EPT EPT -6.5 2nd EPT backward -8.two
3rd EPT EPT -ten.nine third EPT backward -13.2
Dozing procedure charge(moving length 40m) 350m3/h
Torque converter
Torque converter used in SD7 bulldozer is EPT separating EPT-mechanic variety.
EPT assembly
It integrates cEPTr EPT, EPT and speed changing manage valve into one particular ingredient. It can be assembled or disassembled as a assembly or as a portion. It is quite hassle-free to services. EPT is multi-phase planetary EPT EPT to understand modular assembling and disassembling. The change can be modified amongst 1st EPT, 2nd EPT, third EPT EPT or reverse swiftly, through multi-functional manage valve.
Steering and braking clutch
Steering clutch and braking clutch are adjustment cost-free, oil-sort , multi-disc clutch. The braking clutch is pressed by EPT, divided EPTly, constant meshed variety. Steering clutch is EPT pressed, non-continual engaged clutch. The motion of steering and braking is combined, procedure manually to recognize steering little by little, sharply and braking. The braking of complete EPT can be realized by means of the pedal. Parking braking rod is created to keep the undercarriage method in braking situation when commencing the engine and assure the EPT not to slip on sXiHu (West Lake) Dis.Hu (West Lake) Dis.e when beginning the engine.
Final EPT
Ultimate EPT is two-phase planetary reduction EPT mechanism. It is mounted at exterior of steering and braking clutch. Mixed sprocket section is extremely practical for assembling, disassembling and provider.
EPT system of the EPT
It is composed of oil pump, EPT management valve, steering and braking manage valve, sequence valve, reduction valve at torque convertor outlet, filter and lines.
Main pump————————————————————————————————————-Gear pump
Oil stream—————————————————————————————————————-160L/min
Functioning force ——————————————————————————————————3.1MPa
Rops with air conditioner taxi
The cab is hexagonal thin wall box-sort composition. Glass is mounted at 6 sides with broad viewing region. Pulling and pushing EPT is installed at back facet. Air conditioner is top-mounted with features of cooling and heating. The composition of Rop is rigid. It can defend the EPTr effectively when the bulldozer is in EPT situation.
EPTlement EPT method
EPTlement EPT method can handle lifting, lowing and tilting of the blade. It also can management lifting, lowing of the ripper. It mainly is composed of oil pump, cylinder, inlet valve group diverter valve team, oil tank line and managing elements.
Main pump —————————————————————————————— Substantial pressure EPT pump
Oil stream ————————————————————————————————————–194L/min
Method functioning stress——————————————————————————————-18.6MPa
Remaining and proper undercarriage technique
The keep track of is triangle condition. The sprocket is elevated. There are two idlers in entrance and at rear of the frame and 7 observe roller. EPTil EPT and cylinder adjuster is mounted at the undercarriage. The rear finish of undercarriage frame is supported on the pivot. The entrance end is articulated with the equalizer bar. Selecting diverse undercarriage method according to diverse employ. The buyer is needed can assure cEPTr gravity of the EPT to be at ideal efficient position. Selecting distinct width of track shoe can make sure the bulldozer deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ing its optimum traction efficiency.
Upkeep filling capability
Gas tank ——————————————————————————————————————— 450L
H2o tank of cooling system ———————————————————————————————118L
Camshaft box of the engine————————————————————————————————-20L
EPTl EPT scenario————————————————————————————————————–150L
EPTlement oil tank——————————————————————————————————— 100L
Pivot lubricating tank——————————————————————————————————-15L
Ultimate EPT ——————————————————————————————————————15L
Optional apply and components (*common)
one)taxi
A, Rops with air conditioner cab *
B, Rops cab
C, Rops cover
2)Front mounted implement
A, straight tilting blade *
B, Angle blade
C, U-sort blade
3)Rear mounted implement
A, single shank ripper
B, three shanks ripper
C, back again drawing mechanism
4)Track shoe of undercarriage
Optional keep track of shoe width
A, 510mm B , 560mm *
C, 660mm D , 914mm
five)winch dozer utilized in forest, desert dozer, LGP dozer ,HW dozer can be decided on according to EPT needs of client.

