
We – EPG Group the biggest worm gearbox, couplings and gears factory in China with 5 different branches. For more details: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
/
Product Description
A: Description
The cylinders and the screw stems of the above extruders are made of high-quality alloy steel with optimum hardness and strong corrosion resistance after revision finishing and nitrogen treatment. The auxiliary machine has a platform wor ept table for ma ept peration easy. The coiling unit adopts torque motor to keep proper tension and make rolling even and roll-changing easy.
B. USAGE:
It is used for blowing the various plastic film of low density polyethylene(LDPE), high density polyethylene (HDPE) and linear low density polyethylene(LLDPE) etc, Which are widely used for pac ept industrial products, textile, garments and food and for cohering farmland.
C.Technology Parameter
| Model | FB-MN600 | FB-MN500 | |
| Screw Diameter | 50mm | 45mm | |
| Screw Ratio | L/D28:1 | L/D28:1 | |
| Screw Speed | 10-100r/min | 10-100r/min | |
| Power of Main Motor | 11KW | 7.5KW | |
| Max. Extrude Output | 35kg/h | 25kg/h | |
| Max. Folding Width of Film | 600mm | 500mm | |
| Single-sided Thickness of Film | 0.006 -0.10mm | 0.006 -0.10mm | |
| Total Power | 18Kw | 15Kw | |
| Weight of Machine | 2000kg | 1800kg | |
| Overall Dimensions(L×W×H) | 1500×1800× 2200mm | 1500×1600× 2200mm |
D: Details Information
1. Extruder Unit
Die Head Material: Cr40 Mould Steel
Die Head Heating: Steel Stainless
Rotary Die Head: Optional
Screw and Barrel Material: 38CrMoALA
Screw and Barrel Heating:3Zones
Heating Ring Material: Steel Stainless
Screen Changer: Manual Type
Gear Box: Hard Tooth Surface Gear Box
2. Take Up Section
‘A’ Shape Film Forming Plate: Wooden Bar Type
Film Bubble Setting Ring: Wooden Bar Type
Take Up Motor:Three-Phase Asynchronous Motor with Worm Gear Reducer
Take Up Rollers Grasp: Air Cylinder
3. Winder Unit
Rewinder Type: Friction Type
Rewinding Station: Single Stations
Rewinding Motor: Torque Motor
Pinch Roller: Steel Roller
E. After service of XIHU (WEST LAKE) DIS.
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer’s visa, air tickets, hotel, food, and also their salary 80USD per day per person.
4. How long of your machine’s warranty period?
All our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician’s cost.
6. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.
F. XIHU (WEST LAKE) DIS. Workshop
Welcome to contact with me freely any query.
/
The use of original equipment manufacturer’s (OEM) part numbers or trademarks , e.g. CASE® and John Deere® are for reference purposes only and for indicating product use and compatibility. Our company and the listed replacement parts contained herein are not sponsored, approved, or manufactured by the OEM.
/

